Contact us

Project’s context & challenges

English Heritage manages Stonehenge, one of the world's most iconic prehistoric monuments and a UNESCO World Heritage Site, welcoming approximately 1.6 million visitors annually. To enhance the visitor experience, a new Visitor Centre was opened in 2013, located approximately 2 km from the monument and featuring exhibition areas, a café, and retail facilities.

Operating in an area affected by water scarcity and without access to mains water or sewerage infrastructure, the Visitor Centre required a sustainable and reliable wastewater treatment and water reuse solution capable of handling peak visitor numbers of up to 9,000 people per day. At the same time, the solution needed to meet strict environmental discharge requirements while preserving the integrity and conservation status of this World Heritage Site.

The challenge was to design and deliver a compact, above-ground decentralised treatment system that would remain largely invisible to visitors, minimise environmental impact, reduce freshwater abstraction, and provide long-term operational reliability.

Key figures

1.6 million

Annual visitor capacity

9,000 visitors

Peak daily capacity

~66% water reuse

Reduction in potable water demand

12+ years

Continuous operational performance

Solution

Nijhuis Saur Industries designed, built, and continues to operate and maintain an advanced onsite water reuse system for the Stonehenge Visitor Centre. The decentralised treatment solution combines biological treatment, membrane filtration, activated carbon polishing, and UV disinfection to produce high-quality treated water suitable for reuse while ensuring compliance with environmental discharge standards.

The compact containerised installation supports sustainable water management at one of the world’s most visited heritage locations by reducing freshwater consumption and enabling fully off-grid operation independent of mains water and sewerage connections.

Scope of supply

 

  • Design and construction of the onsite water reuse system
  • Blackwater treatment and water reuse
  • Full operation and maintenance services
  • Compliance monitoring and reporting
  • Borehole water treatment support
  • Long-term performance optimisation
  • Remote monitoring and diagnostics via i-MONITORING

 

Applied solutions

  • Decentralised blackwater reuse system
  • Membrane Bioreactor (MBR) technology
  • Ultrafiltration
  • Granular Activated Carbon (GAC) polishing
  • UV disinfection
  • Water reuse for toilet flushing
  • Above-ground compact treatment design
  • Smart remote monitoring through i-MONITORING

 

Customer benefits

Sustainable water management in a water-scarce region

The solution enables approximately 66% water reuse, significantly reducing dependence on freshwater abstraction while supporting sustainable site operations

Fully off-grid operation

The Visitor Centre operates independently from mains water and sewerage networks, providing resilience and operational continuity in a remote location

Long-term operational reliability

With more than 12 years of continuous operation, the installation is one of the longest-running blackwater reuse systems in the United Kingdom, demonstrating proven performance and reliability

Protection of a World Heritage Site

The treatment system consistently meets strict environmental discharge consent requirements, helping preserve the surrounding environment and the unique conservation value of Stonehenge

Expert lifecycle support

Through a complete design-build-operate-maintain approach and digital monitoring services, Nijhuis Saur Industries provides a single point of responsibility and ensures long-term compliance and performance

Contact our experts for more information